400 TPH VSI Sand Manufacturing Plant — Australia

High-quality manufactured sand production line using vertical shaft impact crushers with closed-circuit screening and water-recycling classification, producing concrete-grade sand.

Global
2025
Project Case Studies
2,000+ Tons / Day Capacity
30+ Equipment Units
12 Months Delivery

Project Background

With natural river sand becoming restricted in Australia, a major concrete producer needed 400 TPH of manufactured sand conforming to AS 1141 and AS 2758.1 for ready-mix concrete and pre-cast products.

Process Design

WSHT engineered a wet-process manufactured sand system with high-efficiency classification:

  • Feed from a 10-20mm crushed rock stockpile via apron feeder
  • Two B9100 VSI sand makers in parallel, each 200 TPH
  • Two-stage wet screening (2-deck + 3-deck) with spray bars for fines removal
  • Hydrosizer for fines (-75μm) classification and dewatering
  • Thickener and water recycling system (90% water recovery)

Equipment Supplied

2× VSI sand makers, 5× multi-deck vibrating screens, 2× hydrosizers, 2× dewatering screens, slurry pumps, and a complete water treatment circuit. Centralized control with HMI touch-screen operation.

Installation & Compliance

Project delivered on a 7-month schedule, complying with all Australian mine safety, environmental and noise regulations. Plant noise level measured at 78 dB(A) at property boundary, 2 dB below local limit.

Performance & Results

Final manufactured sand meets AS 2758.1 specification with FM = 2.65, water demand 8.5% (target 9% max), 14-day concrete strength +12% over the control mix. Plant has been operating at 105% of nameplate capacity for the first 8 months.

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0148
  • Location Global
  • Mineral Type Project Case Studies
  • Year Completed 2025
  • Design Capacity 2,000+ tpd
  • Delivery Time 12 Months
  • Equipment Count 30+ Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email contact@wshtmining.com