250 TPH Portable Crushing Train — Middle East Aggregate Project

Modular mobile crushing and screening train for rapid-deployment aggregate production at a remote Middle East quarry site, designed for high-temperature operation.

Global
2025
Project Case Studies
2,000+ Tons / Day Capacity
30+ Equipment Units
12 Months Delivery

Project Background

A regional construction contractor required a fully mobile aggregate production train that could be rapidly relocated between 3 quarry sites in the desert. The equipment had to operate reliably at ambient temperatures of 45-52°C with high dust load and no on-site grid power.

Solution Design

WSHT proposed a track-mounted 4-stage mobile train:

  • Mobile jaw crusher (C96, 250 TPH) on tracked chassis
  • Mobile cone crusher (HP200) with integrated vibrating screen
  • Mobile VSI sand maker (B7100) for cubical product
  • Mobile stacker conveyors for finished product stockpiling
  • Diesel-hydraulic drive with low-fuel-consumption Tier 4 engines

Heat & Dust Adaptation

All radiators oversized by 30% for 50°C operation, dust-proof electrical enclosures (IP65), desert-specification air filters, and reinforced conveyor belts with high-temperature rubber covers. Optional water-spray dust suppression integrated into the train.

Deployment & Performance

The full train was mobilized from port to site in 3 days, and commissioning was completed within 36 hours of arrival. The train has now been relocated 6 times across the 3 quarry sites without major overhaul. Cumulative running hours > 4,500 with availability > 94%.

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0147
  • Location Global
  • Mineral Type Project Case Studies
  • Year Completed 2025
  • Design Capacity 2,000+ tpd
  • Delivery Time 12 Months
  • Equipment Count 30+ Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email contact@wshtmining.com