500 TPD Gold Processing Plant — Mongolia EPC Turnkey Project

Full EPC turnkey delivery of a 500 TPD gold processing plant in Mongolia, covering crushing, grinding, gravity separation and CIL cyanidation circuits. Project commissioned within 11 months from contract signing.

Global
2025
Project Case Studies
2,000+ Tons / Day Capacity
30+ Equipment Units
12 Months Delivery

Project Background

The client — a mid-tier gold mining operator with multiple open-pit deposits in central Mongolia — needed a complete turnkey gold processing plant to treat 500 tonnes of ore per day. The ore body was oxidized near-surface transitioning to sulfide at depth, requiring a flexible process flowsheet that could handle both ore types without major equipment changes.

Process Design

WSHT's process engineering team conducted on-site ore sampling and lab-scale beneficiation tests over 8 weeks. The recommended flowsheet included:

  • Two-stage jaw + cone crushing reducing ROM ore to -12mm
  • Single-stage ball milling in closed circuit with hydrocyclones (P80 = 75μm)
  • Gravity concentration with intensive leach reactor for coarse gold recovery
  • 6-stage CIL (Carbon-in-Leach) cyanidation circuit for fine gold
  • Carbon elution, electrowinning and smelting on-site

Equipment Supplied

WSHT manufactured and supplied the entire mechanical package: PE900×1200 jaw crusher, HP300 cone crusher, MQG2700×3600 ball mill, hydrocyclone cluster, CIL tanks with agitators, desorption & electrowinning skid, and full laboratory equipment. All equipment CE / ISO 9001 certified.

Civil & Installation

The civil scope covered 6,500 m² of concrete foundations, 1,800 t of steel structure, all process piping and a 1.2 km access road. Our Mongolian-resident installation team completed mechanical and electrical erection in 5 months, with zero lost-time incidents.

Commissioning & Performance

Plant commissioning was completed in 6 weeks, including no-load tests, water load tests, and 72-hour performance runs. Final metallurgical results: 92.5% gold recovery at a head grade of 3.8 g/t, exceeding contractual guarantees.

Outcomes & Long-Term Support

The plant has now been in continuous operation for over 12 months. WSHT provides remote process monitoring, monthly on-site audits and a 5-year spare parts supply contract. The client has signed a follow-on EPC contract for a second 1,000 TPD line at an adjacent deposit.

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0143
  • Location Global
  • Mineral Type Project Case Studies
  • Year Completed 2025
  • Design Capacity 2,000+ tpd
  • Delivery Time 12 Months
  • Equipment Count 30+ Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.