Project Background
Ghanaian small-scale mining cooperative required 200 TPD gravity gold recovery plant for alluvial and shallow hard rock ore.
Process Design
Scrubber → trommel → sluice boxes → Knelson concentrators → shaking tables → gold room smelting on site.
Results
95% gold recovery across all size fractions. Fully modular containerized design, installed in 6 weeks.
