WSHT Mining Group
WSHT Mining Group
EPC Case Study · Project Case Studies

1,000 TPD Spodumene DMS Plant — Canada

Lithium ore dense-medium separation plant producing 6% Li2O spodumene concentrate for battery-grade lithium converter feed.

Global
2025
Project Case Studies
2,000+ Tons / Day Capacity
30+ Equipment Units
12 Months Delivery

Project Background

Canadian critical minerals developer required 1,000 TPD spodumene concentrator for a pegmatite deposit in northern Quebec.

Process Design

Primary + secondary + tertiary crushing → two-stage DMS (dense medium separation) at 4mm and 0.5mm cut points → magnetic separation → dewatering.

Results

6.1% Li2O concentrate at 79% recovery. Cold-climate design for -40°C ambient operation.

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0171
  • Location Global
  • Mineral Type Project Case Studies
  • Year Completed 2025
  • Design Capacity 2,000+ tpd
  • Delivery Time 12 Months
  • Equipment Count 30+ Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email contact@wshtmining.com