Project Background
A mid-tier gold mining company in northern Tanzania required a complete 500 TPD gold processing plant to treat oxide and transitional ore from two open-pit deposits.
Process Design
WSHT designed a complete CIL (Carbon-in-Leach) flowsheet including two-stage crushing, ball milling, gravity concentration, and 6-stage CIL cyanidation with Zadra elution regeneration circuit.
Results
92.5% gold recovery at 3.2 g/t head grade. Plant commissioned in 10 months from contract signing.
