EPC Case Study · Project Case Studies

Weihui Wanyou Building Materials Project, Henan, China

Standardized 1,000 TPH green building material plant in Weihui, Henan. Zero-discharge operation with full environmental compliance and Henan Green Mine certification.

Weihui, Henan, China
2025
Project Case Studies
1,000 Tons / Day Capacity
16 Equipment Units
8 Months Delivery

Project Overview

The Weihui Wanyou Building Materials Project in Henan Province is a model for standardized green building material production. This 1,000 TPH plant achieves zero-discharge operation and has received Henan Province Green Mine certification.

Project Scope

WSHT supplied a complete three-stage crushing and screening system designed to meet China strictest environmental standards. The facility processes local limestone with comprehensive dust control, noise reduction, and water recycling systems.

Process Flow

Primary Crushing: A C120 jaw crusher (1200×900 mm, 180-350 t/h) in a fully enclosed crushing chamber with negative-pressure dust extraction system.

Secondary Crushing: 2× HPT-300 multi-cylinder cone crushers (100-200 t/h each) in parallel for −40 mm product. Sound-insulated crusher housings reduce noise to < 75 dB at 1m distance.

Tertiary Crushing: VSI-8518 sand maker (80-180 t/h) for manufactured sand and fine aggregate. Product washed in XSD-2610 sand washer.

Environmental Systems: Complete dust collection (pulse-jet bag filter, 99.5% efficiency), noise barriers (3m height, 25 dB reduction), and zero-discharge water treatment (multi-stage settling + filtration).

Key Equipment

EquipmentSpecificationCapacity
C120 Jaw Crusher1200×900 mm, 180-350 t/hPrimary (enclosed)
2× HPT-300 Cone CrushersMulti-cylinder, 100-200 t/hSecondary
VSI-8518 Sand Maker80-180 t/hTertiary + sand
XSD-2610 Sand WasherWheel type, 100 t/hSand washing
Pulse-Jet Bag Filter2,000 m², 99.5% efficiencyDust collection
Noise Barriers3m height, steel + absorberNoise control
Water TreatmentSettling + filtration, zero-dischargeWater management
SCADA ControlAutomated, remote monitoringIntelligence

Project Highlights

  • Capacity: 1,000 TPH (300,000 TPA)
  • Environmental: Zero-discharge, 99.5% dust capture
  • Noise: Below 75 dB at property boundary
  • Water: 100% recycling, closed-loop system
  • Certification: Henan Province Green Mine certified
  • Power: 5 MW connected, 3.5 MW average
  • Timeline: 8 months EPC delivery
  • Location: Weihui City, Henan, China

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0344
  • Location Weihui, Henan, China
  • Mineral Type Project Case Studies
  • Year Completed 2025
  • Design Capacity 1,000 tpd
  • Delivery Time 8 Months
  • Equipment Count 16 Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.