Sichuan-Tibet Railway China Railway 11th Bureau High-Quality Aggregate Project

Railway supporting aggregate plant for Sichuan-Tibet Railway at 1,000 TPH. Mobile and modular design for high-altitude operation (4,000m+) in extreme terrain.

Sichuan-Tibet, China
2024
Project Case Studies
2,000 Tons / Day Capacity
30 Equipment Units
6 Months Delivery

Project Overview

The Sichuan-Tibet Railway China Railway 11th Bureau High-Quality Aggregate Project is a critical infrastructure support facility for one of the world most challenging railway construction projects. This 1,000 TPH plant operates at altitudes of 3,000-4,500 meters in extreme mountain terrain.

Project Scope

WSHT designed a mobile and modular crushing solution capable of rapid deployment along the railway alignment. The system processes local granite and gneiss into railway-grade aggregates meeting TB/T 2140 standards.

Process Flow

Primary Crushing: A track-mounted jaw crusher (C100, 1000×650 mm) processes blasted rock at 150-300 t/h. Mobile design allows relocation every 3-6 months as construction progresses.

Secondary Crushing: A modular cone crusher (HP300, 100-200 t/h) on a portable skid reduces product to −40 mm. Altitude-compensated engine maintains power output at 4,000m elevation.

Screening: A triple-deck vibrating screen (3YK-1860, 100-200 t/h) classifies product into railway ballast (25-60 mm), concrete aggregate (5-25 mm), and manufactured sand (0-5 mm).

Key Equipment

EquipmentSpecificationCapacity
Track-Mounted C100 Jaw1000×650 mm, 150-300 t/hPrimary (mobile)
Portable HP300 Cone100-200 t/h, altitude-ratedSecondary (modular)
3YK-1860 ScreenTriple-deck, 100-200 t/hClassification
Altitude CompensationTurbocharger, engine derating4,000m+ operation
Dust SuppressionEnclosed chambers + waterEnvironmental
Diesel Generators2× 1.5 MW, Tier 4 FinalPower supply
Mobile ChassisTrack-mounted + towedRelocation
PLC ControlAutomated, remote monitoringIntelligence

Project Highlights

  • Capacity: 1,000 TPH (300,000 TPA)
  • Special: High-altitude operation (3,000-4,500m)
  • Quality: TB/T 2140 railway ballast standards
  • Mobile: Track-mounted primary, rapid relocation
  • Power: Dual 1.5 MW diesel generators
  • Challenge: Extreme terrain, seismic zone
  • Timeline: 8 months deployment
  • Location: Sichuan-Tibet Railway, China

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0343
  • Location Sichuan-Tibet, China
  • Mineral Type Project Case Studies
  • Year Completed 2024
  • Design Capacity 2,000 tpd
  • Delivery Time 6 Months
  • Equipment Count 30 Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email sales@hnwsht.cn