Liuzhou Xiangyun Building Materials Project, Guangxi, China

Large 2,500 TPH aggregate production base in Liuzhou, Guangxi. 24/7 continuous operation with 95% availability, serving regional infrastructure and automotive industries.

Liuzhou, Guangxi, China
2024
Project Case Studies
1,200 Tons / Day Capacity
20 Equipment Units
10 Months Delivery

Project Overview

The Liuzhou Xiangyun Building Materials Project is a major 2,500 TPH aggregate production base in Liuzhou City, Guangxi Province. The facility operates 24/7 with 95% availability, supplying aggregates to Liuzhou massive infrastructure and automotive manufacturing sectors.

Project Scope

WSHT provided a high-capacity crushing and screening system designed for continuous operation with redundant equipment for maintenance flexibility.

Process Flow

Primary Crushing: C160 jaw crusher (1600×1200 mm, 400-1000 t/h) with hydraulic CSS adjustment and automatic tramp iron protection.

Secondary Crushing: 3× HP500 cone crushers in parallel (150-300 t/h each) with individual VFD drives for load optimization.

Tertiary Crushing: 2× HP300 cone crushers (80-180 t/h each) in closed circuit with 2× 3YK-2460 vibrating screens.

Stockpile: 6× radial stackers create 30,000-tonne live stockpiles per product size. Automated truck loading with weigh-bridge system.

Key Equipment

EquipmentSpecificationCapacity
C160 Jaw Crusher1600×1200 mm, 400-1000 t/hPrimary
3× HP500 Cone CrushersVFD, 150-300 t/h eachSecondary
2× HP300 Cone CrushersShort-head, 80-180 t/hTertiary
2× 3YK-2460 Screens3-deck, high-capacityClassification
6× Radial Stackers1.2 m belt, 800 t/hStockpiling
Weigh-Bridge SystemAutomated truck loadingLogistics
Redundant CrushersN+1 configurationAvailability
SCADA + VFDLoad optimization, 24/7Intelligence

Project Highlights

  • Capacity: 2,500 TPH (750,000 TPA)
  • Operation: 24/7, 95% availability, 340 days/year
  • Redundancy: N+1 crusher configuration
  • Market: Liuzhou infrastructure + automotive industry
  • Power: 12 MW connected, 9 MW average
  • Stockpile: 180,000 tonnes total live capacity
  • Timeline: 10 months EPC delivery
  • Location: Liuzhou City, Guangxi, China

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0346
  • Location Liuzhou, Guangxi, China
  • Mineral Type Project Case Studies
  • Year Completed 2024
  • Design Capacity 1,200 tpd
  • Delivery Time 10 Months
  • Equipment Count 20 Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email sales@hnwsht.cn