EPC Case Study · Project Case Studies

Jincheng Ruian Building Materials Project, Shanxi, China

Eco-friendly 2,000 TPH sand and stone plant in Jincheng, Shanxi. Full enclosure, negative-pressure dust collection, 98% water recycling rate. Meets Shanxi green mine standards.

Jincheng, Shanxi, China
2025
Project Case Studies
1,000 Tons / Day Capacity
16 Equipment Units
10 Months Delivery

Project Overview

The Jincheng Ruian Building Materials Project in Shanxi Province is a new-generation eco-friendly aggregate production facility. This 2,000 TPH plant combines high-efficiency crushing with comprehensive environmental protection, meeting Shanxi Province strictest green mine standards.

Project Scope

WSHT provided a complete aggregate processing solution with emphasis on dust control, noise reduction, and water conservation. The facility processes local limestone and sandstone into premium construction aggregates.

Process Flow

Primary Crushing: C140 jaw crusher (1400×1060 mm, 250-500 t/h) in fully enclosed crushing chamber with negative-pressure dust extraction (−50 Pa differential).

Secondary Crushing: 2× HPT-300 multi-cylinder cone crushers (100-200 t/h each) with sound-insulated housings (noise < 75 dB at 1m).

Tertiary Sand Making: VSI-8518 sand maker (80-180 t/h) with water spray dust suppression at feed and discharge points.

Water Management: Complete water recycling system: process water → multi-stage settling → filtration → reuse. 98% recycling rate, zero liquid discharge.

Key Equipment

EquipmentSpecificationCapacity
C140 Jaw Crusher1400×1060 mm, 250-500 t/hPrimary (enclosed)
2× HPT-300 Cone CrushersMulti-cylinder, 100-200 t/hSecondary
VSI-8518 Sand Maker80-180 t/hTertiary + sand
XSD-2610 Sand WasherWheel type, 100 t/hSand washing
Negative-Pressure System−50 Pa, dust extractionDust control
Sound InsulationCrusher housings, < 75 dBNoise control
Water RecyclingSettling + filtration, 98%Zero discharge
SCADA ControlAutomated, remote monitoringIntelligence

Project Highlights

  • Capacity: 2,000 TPH (600,000 TPA)
  • Environmental: Full enclosure, negative-pressure dust
  • Noise: Below 75 dB at 1m from crushers
  • Water: 98% recycling, zero liquid discharge
  • Certification: Shanxi Province Green Mine certified
  • Power: 9 MW connected, 6.5 MW average
  • Timeline: 10 months EPC delivery
  • Location: Jincheng City, Shanxi, China

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0348
  • Location Jincheng, Shanxi, China
  • Mineral Type Project Case Studies
  • Year Completed 2025
  • Design Capacity 1,000 tpd
  • Delivery Time 10 Months
  • Equipment Count 16 Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email sales@hnwsht.cn