EPC Case Study · Project Case Studies

Dexing Hongtai Stone Eco-Friendly Building Materials Project, Jiangxi, China

Environmental sand and stone plant in Dexing, Jiangxi processing 5,000 TPH of granite into premium aggregates. Advanced dust control, water treatment, and tailings utilization.

Dexing, Jiangxi, China
2024
Project Case Studies
800 Tons / Day Capacity
16 Equipment Units
12 Months Delivery

Project Overview

The Dexing Hongtai Stone Eco-Friendly Building Materials Project transforms mineral processing waste from the Dexing copper mine region into high-quality construction aggregates. This 5,000 TPH facility demonstrates WSHT commitment to circular economy principles in mining.

Project Scope

WSHT designed a comprehensive aggregate processing system with emphasis on environmental protection: enclosed crushing, wet scrubbing, advanced dust collection, and zero-discharge water treatment. The plant processes local granite and mine waste rock.

Process Flow

Primary Crushing: ROM material (−800 mm) is crushed by a C160 jaw crusher (1600×1200 mm, 400-1000 t/h) in an enclosed crushing chamber with negative-pressure dust extraction.

Secondary Crushing: 3× HP800 cone crushers operate in parallel, producing −60 mm product at 400-800 t/h combined capacity. Each crusher is individually motorized with variable-frequency drive.

Tertiary Crushing & Sand: 2× VSI-1263 sand makers produce cubical aggregate and manufactured sand. Final product is wet-washed in XSD-3620 wheel sand washers.

Water Treatment: A complete water treatment plant processes all process water through flocculation, sedimentation, and filtration. 100% water recycling with zero liquid discharge.

Key Equipment

EquipmentSpecificationCapacity
C160 Jaw Crusher1600×1200 mm, 400-1000 t/hPrimary
3× HP800 Cone CrushersParallel, 400-800 t/h totalSecondary
2× VSI-1263 Sand Makers300-600 t/h eachTertiary + sand
2× XSD-3620 Sand WashersWheel type, 200 t/h eachSand washing
Enclosed Crushing ChambersNegative-pressure, 99.5% dustEnvironmental
Water Treatment PlantFlocculation + sedimentationZero discharge
Tailings UtilizationMine waste → aggregateCircular economy
SCADA + AI ControlReal-time optimizationIntelligence

Project Highlights

  • Capacity: 5,000 TPH (1,500,000 TPA)
  • Innovation: Mine waste rock utilization (circular economy)
  • Environmental: Zero visible dust, zero liquid discharge
  • Water: 100% recycling, closed-loop system
  • Dust Control: 99.5% capture, fully enclosed workshops
  • Jiangxi Green Mine: Certified to provincial standards
  • Timeline: 12 months EPC delivery
  • Location: Dexing City, Jiangxi, China

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0339
  • Location Dexing, Jiangxi, China
  • Mineral Type Project Case Studies
  • Year Completed 2024
  • Design Capacity 800 tpd
  • Delivery Time 12 Months
  • Equipment Count 16 Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email sales@hnwsht.cn