(China) Shunxing Building Materials Project in Jingdezhen, Jiangxi

Intelligent 1,500 TPH aggregate plant in Jingdezhen, Jiangxi. AI-based process optimization, real-time quality control, and smart manufacturing technology.

Jingdezhen, Jiangxi, China
2024
Project Case Studies
800 Tons / Day Capacity
14 Equipment Units
8 Months Delivery

Project Overview

The Shunxing Building Materials Project in Jingdezhen represents a new generation of intelligent aggregate production. This 1,500 TPH facility applies AI-based process optimization and real-time quality monitoring for consistent product specifications.

Project Scope

WSHT provided an intelligent crushing and screening system with deep learning-based process optimization, automatic grade adjustment, and predictive maintenance capabilities.

Process Flow

Primary Crushing: A C120 jaw crusher (1200×900 mm, 180-350 t/h) processes ROM material with hydraulic CSS optimization.

Secondary Crushing: HPT-300 multi-cylinder cone crusher (100-200 t/h) with automatic stroke adjustment based on real-time feed characterization.

Tertiary Sand Making: VSI-8518 sand maker (80-180 t/h) produces high-quality manufactured sand. AI controls rotor speed and cascade ratio for optimal particle shape.

Quality Control: Online particle size analyzer (PSI) provides real-time feedback to process control system. Automatic adjustment of crusher settings, screen apertures, and sand washer parameters.

Key Equipment

EquipmentSpecificationCapacity
C120 Jaw Crusher1200×900 mm, 180-350 t/hPrimary
HPT-300 Cone CrusherMulti-cylinder, 100-200 t/hSecondary
VSI-8518 Sand Maker80-180 t/hSand making
2YK-1860 ScreenDouble-deck, 1800×6000 mmClassification
Online PSI AnalyzerReal-time particle sizeQuality control
AI Process ControlDeep learning optimizationIntelligence
Predictive MaintenanceVibration + oil analysisReliability
Dust CollectionPulse-jet, 99.5%Environmental

Project Highlights

  • Capacity: 1,500 TPH (450,000 TPA)
  • Intelligence: Deep learning AI process optimization
  • Quality: Real-time PSI, automatic grade adjustment
  • Maintenance: Predictive, vibration + oil analysis
  • Power: 6 MW connected, 4.5 MW average
  • Efficiency: 15% energy savings vs conventional
  • Timeline: 8 months EPC delivery
  • Location: Jingdezhen, Jiangxi, China

Project Highlights

Efficient Delivery

Completed 30 days ahead of schedule with zero safety incidents during 1,200+ construction days.

Over-Performance

Plant capacity exceeds design specification by 15%, achieving 3,000 tpd within first 3 months.

Environmental Compliance

Full compliance with international environmental standards including ISO 14001 certification.

Client Satisfaction

5-year O&M contract extension signed — a testament to our delivery quality and support.

Have a Similar Project in Mind?

Our EPC team has delivered 500+ mining projects worldwide. Tell us about your project — we'll respond within 48 hours.

Project Info

  • Project ID WSHT-EPC-0342
  • Location Jingdezhen, Jiangxi, China
  • Mineral Type Project Case Studies
  • Year Completed 2024
  • Design Capacity 800 tpd
  • Delivery Time 8 Months
  • Equipment Count 14 Units
  • Project Scope Full EPC + O&M

EPC Project Hotline

+86 135 2500 5907

Speak with our senior EPC engineer today. Free consultation and site assessment.

START YOUR EPC PROJECT

From Concept to Commissioning — One Partner, One Promise.

Tell us about your ore body, target capacity and project location. Our EPC team will respond with a tailored proposal within 48 hours.

EPC Hotline +86 135 2500 5907
Project Email sales@hnwsht.cn