WSHT Delivers 500 TPD Copper Processing Plant to DRC — Complete EPC Project

A detailed case study of a 500 tpd copper sulfide processing plant delivered by WSHT in the Democratic Republic of Congo, covering crushing, grinding and flotation circuit design, equipment supply, project execution and operational results.

coco
Editorial Team
· 2026-07-05 · 2 min read
Share

Project Overview

WSHT completed a turnkey EPC (Engineering, Procurement and Construction) project for a 500 tonnes-per-day copper sulfide processing plant in the Democratic Republic of Congo. The project was delivered on schedule and within budget, achieving all performance guarantees.

Project Background

The client is a mid-tier mining company operating a copper sulfide deposit in the Katanga Copperbelt region. The project required a complete processing plant — from primary crushing to final concentrate — capable of producing 22-25% copper concentrate for smelting.

Process Design

Crushing Circuit:

  • Primary jaw crusher (600×900mm) — feed size up to 500mm
  • Secondary cone crusher in closed circuit with vibrating screen
  • Product size: 80% passing 12mm

Grinding Circuit:

  • Ball mill (2.4m × 4.5m) in closed circuit with hydrocyclones
  • Grinding product: 80% passing 150 microns

Flotation Circuit:

  • Rougher flotation, scavenger flotation and two-stage cleaner flotation
  • Flotation cell volumes: 20m³ rougher, 10m³ cleaner
  • Reagent scheme: xanthate collector, MIBC frother, lime pH modifier
WSHT Copper Processing Plant DRC

500 TPD Copper Processing Plant — DRC, Africa

Equipment Supplied

WSHT provided the complete equipment scope including:

  • Jaw crusher, cone crusher, vibrating screens
  • Belt conveyors, feeders and chutework
  • Ball mill, hydrocyclone cluster
  • Flotation cells (rougher, scavenger, cleaner banks)
  • Reagent preparation and dosing system
  • Thickener, filter press and concentrate handling
  • Complete MCC, PLC and control system

Project Execution Results

  • Throughput: 520 tpd (design 500 tpd)
  • Concentrate grade: 24.5% Cu (design 22%)
  • Copper recovery: 89% (design 86%)
  • Project duration: 14 months from contract to first concentrate
  • Equipment availability: 93% after commissioning

Customer Testimonial

The DRC-based customer praised WSHT's project management, equipment quality and after-sales support. The plant has been operating reliably for over 18 months with consistently excellent metallurgical performance.

WSHT provides complete EPC solutions for copper processing plants from 100 to 5,000+ tpd. Contact us to discuss your copper project requirements.

Written by

coco

We are an original mining machinery supplier committed to stable processing performance and one-stop service for international mining projects.

Looking for a reliable mining equipment partner? Let's Talk.

Global EPC project delivery, custom configuration and 24/7 after-sales support worldwide.